Seaward PrimeTest 200 Instrucciones de operaciones

Busca en linea o descarga Instrucciones de operaciones para Multímetros Seaward PrimeTest 200. Seaward PrimeTest 200 Operating instructions Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 20
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
PrimeTest 100 Operating Instructions
1
Operating Instructions
Bracken Hill
South West Industrial Estate
Peterlee
Co Durham
SR8 2SW
ENGLAND
Tel: +44(0)191 5863511
www.seaward.co.uk
sales@seaward.co.uk
service@seaward.co.uk
Part Number 344A550 Revision 1
© 2006 Seaward Electronic Ltd
Vista de pagina 0
1 2 3 4 5 6 ... 19 20

Indice de contenidos

Pagina 1 - Operating Instructions

PrimeTest 100 Operating Instructions 1 Operating Instructions Bracken Hill South West Industrial Estate Pe

Pagina 2

PrimeTest 100 Operating Instructions 10 If there is a fault with the Neutral connection this is indicated by the display below. In the event of a

Pagina 3

PrimeTest 100 Operating Instructions 11 indicated as shown below. • The test sequence is halted. • If the measured value is less than

Pagina 4

PrimeTest 100 Operating Instructions 12 • The unit will proceed with the Insulation and Leakage tests. Note: The power switch on the appliance

Pagina 5

PrimeTest 100 Operating Instructions 13 3.3 Testing a Class II Appliance • Visually inspect the appliance and mains cord for signs of damage. •

Pagina 6

PrimeTest 100 Operating Instructions 14 current is less than the factory set limit a tick is placed next to the ILEAK enunciator. • The PASS enunc

Pagina 7

PrimeTest 100 Operating Instructions 15 to the Riso enunciator and the test sequence is halted. • If the Insulation Resistance is greater than t

Pagina 8

PrimeTest 100 Operating Instructions 16 • Plug the supplied 0.5m red IEC lead into the IEC socket and into a mains outlet on the extension lead.

Pagina 9

PrimeTest 100 Operating Instructions 17 4 Specification Earth Continuity Accuracy* ± (5% + 2 digits) Test current 200mA minimum Test voltage 9V n

Pagina 10 - Operating Instructions

PrimeTest 100 Operating Instructions 18 Environmental rating IP Rating IP40 Operating temperature range 0°C to 40°C, without moisture condensation

Pagina 11

PrimeTest 100 Operating Instructions 19 6.1 Battery Replacement Before opening the PrimeTest 100 ensure that all test leads are disconnected. •

Pagina 12

PrimeTest 100 Operating Instructions 2 Limited Warranty & Limitation of Liability SEAWARD Electronic Limited guarantees this product to be fr

Pagina 13

PrimeTest 100 Operating Instructions 20 7 Service and Calibration To maintain the specified accuracy of the measurement results, the instrument mu

Pagina 14

PrimeTest 100 Operating Instructions 3 DECLARATION OF CONFORMITY As the manufacturer of the apparatus listed, declare under our sole responsibilit

Pagina 15

PrimeTest 100 Operating Instructions 4 Contents 1 Important Information 5 2 Introduction 7 3 Performing Tests 9 3.1 Checking a mains power outl

Pagina 16

PrimeTest 100 Operating Instructions 5 1 Important Information These operating instructions are intended for the use of adequately trained personn

Pagina 17

PrimeTest 100 Operating Instructions 6 Figure 1. PrimeTest 100 Front View Figure 2. PrimeTest 100 End View

Pagina 18

PrimeTest 100 Operating Instructions 7 2 Introduction The PrimeTest 100 is a hand held battery powered unit suitable for carrying out electrical sa

Pagina 19

PrimeTest 100 Operating Instructions 8 Note: When a key is pressed to initiate a test sequence, the PrimeTest 100 will compare the type of applianc

Pagina 20

PrimeTest 100 Operating Instructions 9 3 Performing Tests Press keys + to switch on the PrimeTest 100. When the unit is ready the display will

Comentarios a estos manuales

Sin comentarios